小木猫

 找回密码
 立即注册

扫一扫,访问微社区

搜索
热搜: 活动 交友 discuz
查看: 1731|回复: 1
打印 上一主题 下一主题

China Land reclamation Project

[复制链接]

91

主题

242

帖子

3296

积分

论坛元老

Rank: 8Rank: 8

积分
3296
跳转到指定楼层
楼主
发表于 2015-6-22 21:23:39 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
http://amti.csis.org/diplomacy-c ... ief-and-subi-reefs/

On June 16, 2015, China’s Foreign Ministry spokesman Lu Kang announced that “as planned, the land reclamation project of China’s construction on some stationed islands and reefs of the Nansha (Spratly) Islands will be completed in the upcoming days.” He went on to note that after land reclamation on existing features was complete, China would continue to construct facilities on its new islands. As of June 17, AMTI assesses that two of China’s land reclamation projects are fully complete, three are nearly complete, and two are ongoing, with active land reclamation still taking place. The map below shows the current status of China’s Spratly building projects.

chinese_reclamation_map_FINAL

The pictures below, taken between early and mid-June, show ongoing work at Mischief and Subi Reef, with dredging activity still underway. Read on for more information about activity at these reefs. China’s announcement comes as Washington and Beijing prepare to meet for the seventh annual Strategic and Economic Dialogues (S&ED) on June 22-24. This timing, coupled with the fact that five of China’s seven projects were nearly finished, leads CSIS scholars to argue that China’s statement represents a change in message, but not a change in policy.

Mischief LR

Mischief Reef. June 10, 2015.

As of June 10, 2015, extensive dredging was still underway at Mischief Reef, as the pictures display. The northern, western, and southern landmasses constructed in the early Spring of 2015 have been connected and continue to expand and be reinforced with seawalls now ringing the reclaimed reef. In the middle of the feature, dozens of dredgers and support craft transit the inner harbor.

Mischief Cover

Mischief Reef. June 10, 2015.

Reclamation is most active along the northeastern rim of the reef, newly reclaimed since AMTI last released photos of Mischief Reef in March. New structures and construction equipment are visible along the northern bank of the reef. At the southern facility, a seawall is being constructed. AMTI assesses that 5,420,000 square meters of land have been reclaimed at Mischief Reef as of June 10, 2015.

Subi LR

Subi Reef. June 5, 2015.

Subi reef has changed dramatically in the last few months. The southern, western, and northern edges of the reef have been reclaimed and an access channel to the inner harbor has been cut out. Most of the reclaimed reef’s infrastructure has been built out on the southwestern landmass. Like Mischief reef, the inner harbor is transited by dozens of support craft with active dredgers operating to the north and south of the reef. A naval vessel is visible to the west of the reef. To the east one dredger can be seen expanding the entrance to the reef. Construction is ongoing with two cement plants being built along the western bank and seawalls now extending across the length of the reclaimed land. AMTI assesses that 3,950,000 square meters of land have been reclaimed at Subi Reef as of June 10, 2015.

Subi Boats LR2

Subi Reef. June 5, 2015.

Follow the AMTI Island Tracker for the latest imagery.

150415_itracker_hp

88

主题

326

帖子

1115

积分

版主

Rank: 7Rank: 7Rank: 7

积分
1115

木猫可人木猫美人木猫迷人热心会员推广达人宣传达人优秀版主论坛元老

沙发
发表于 2015-7-18 12:00:32 | 只看该作者
楼主很棒!
草社区榴最新ip网址

www.caoliu16.com












草社区榴最新地址1024
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

快速回复 返回顶部 返回列表